Storage Space Reduction:
Traditional Storage Costs (rough estimate):
- Cost of 1,000 square foot warehouse space: $1,000-1,500/month
- Pre-made bubble wrap storage: 200-300 sq ft
- Monthly cost: $200-450
With On-Demand System (rough estimate):
Transportation Costs:
Inbound Shipping (rough estimate):
- Traditional: one truck = 24 pallets of ready-made
- On-Demand: one truck = 120 pallets worth (in raw material)
- Cost per truck: $800-1,200
- Annual savings (mid-volume): $9,600-14,400
Material Costs:
Traditional Pre-made (rough estimate):
- Cost per cubic foot: $0.80-1.20
- Waste rate: 15-20%
- Storage damage: 5-10%
On-Demand System (rough estimate):
- Cost per cubic foot: $0.40-0.60
- Waste rate: 3-5%
- Storage damage: <1%
- Annual savings (mid-volume): $12,000-18,000
Operational Efficiency:
Labor Optimization:
Traditional Process (rough estimate):
- Inventory management: 5 hours/week
- Material handling: 8 hours/week
- Storage organization: 4 hours/week
- Total labor: 17 hours/week
On-Demand Process (rough estimate):
- System operation: 10 hours/week
- Material handling: 2 hours/week
- Maintenance: 1 hour/week
- Total labor: 13 hours/week
- Annual labor savings: 208 hours
Space Utilization:
Storage Efficiency (rough estimate):
- Traditional storage: 100 cubic feet = 1,000 filled bags
- On-Demand storage: 100 cubic feet = 5,000 filled bags
- Space efficiency increase: 500%
Production Flexibility:
Response Times (rough estimate):
- Traditional: 24-48 hours for emergency stock
- On-Demand: Immediate production
- Lead time reduction: 95%
Environmental Impact Savings:
Carbon Footprint:
Transportation Reduction (rough estimate):
- 75% fewer delivery trucks
- Lower fuel consumption
- Reduced emissions
- Carbon credit potential
Waste Reduction:
Material Usage (rough estimate):
- 40-50% less material waste
- Recycling efficiency increase
- Lower disposal costs
- Environmental compliance benefits
ROI (Return On Investment): A measure that shows how much money you make compared to how much maney you have invested. It is usually expressed as a percentage. It's calculated by dividing the profit by the investment cost.
Initial Investment:
Small System (rough estimate):
- Equipment cost: $3,000-5,000
- Installation: $500-1,000
- Training: $500
- Total: $4,000-6,500
Large System (rough estimate):
- Equipment cost: $15,000-25,000
- Installation: $2,000-3,000
- Training: $1,500
- Total: $18,500-29,500
Payback Period:
Small System (rough estimate):
- Monthly savings: $2,000-3,000
- Payback period: 2-3 months
- First year Return On Investment: 400-500%
Large System (rough estimate):
- Monthly savings: $8,000-12,000
- Payback period: 3-4 months
- First year Return On Investment: 300-400%