Plastics : On-Demand air-filled packaging systems (bubble wrap, Air Cushion Systems, Air pillows, ...)


Universal Cost Analysis for On-Demand Air Packaging Systems is a method to evaluate the total costs and benefits of using air-filled packaging systems (like bubble wrap or air pillows made on demand).

Direct Cost Savings (Per 1000 Units/Month):

Storage Space Impact:

Traditional Storage:
  • Space needed: ~100 sq ft per 1000 units
  • Average warehouse cost: $0.75-1.50/sq ft/month
  • Monthly storage cost: $75-150
On-Demand System:
  • Space needed: ~10 sq ft per 1000 units
  • Monthly storage cost: $7.50-15
  • Storage cost reduction: 90%
Transportation Efficiency:

Traditional Delivery:
  • 1 standard truck = 25,000 ready-made units
  • Transport cost per unit: $0.03-0.05
On-Demand System:
  • 1 standard truck = 125,000 unit equivalent
  • Transport cost per unit: $0.006-0.01
  • Transport cost reduction: 80%
Material Costs (Per 1000 Units):

Traditional Pre-made:
  • Base material cost: $800-1,000
  • Waste factor: 15-20%
  • Total cost with waste: $920-1,200
On-Demand System:
  • Base material cost: $400-500
  • Waste factor: 3-5%
  • Total cost with waste: $412-525
  • Material cost reduction: 50-55%
Operational Impact (Per Shift):

Labor Hours:
 
Traditional Process (per 1000 units):
  • Material handling: 4 hours
  • Inventory management: 2 hours
  • Organization: 2 hours
  • Total: 8 hours
On-Demand System (per 1000 units):
  • System operation: 3 hours
  • Material handling: 1 hour
  • Maintenance: 0.5 hours
  • Total: 4.5 hours
  • Labor reduction: ~44%
Space Efficiency (Per 100 sq ft):
  • Traditional: 1,000 units capacity
  • On-Demand: 5,000 units capacity
  • Space efficiency increase: 500%
Production Response:

Traditional:
  • Order to delivery: 24-48 hours
  • Minimum order quantity: 1,000 units
On-Demand:
  • Order to delivery: 0-2 hours
  • Minimum order quantity: None
  • Flexibility increase: 95%
Environmental Impact (Per 10,000 Units):

Transportation:
  • Truck loads reduced: 75%
  • CO2 reduction: ~65%
  • Fuel savings: ~70%
Material Usage:
  • Raw material reduction: 40-50%
  • Waste reduction: 70-80%
  • Recycling improvement: 30-40%
Investment Analysis:

Small Operation (Up to 5,000 units/month):

Equipment Investment:
  • Basic system: $5,000-7,000
  • Installation: 10-15% of system cost
  • Training: 5-10% of system cost
ROI Metrics:
  • Monthly savings: $500-750
  • Payback period: 8-12 months
  • First year ROI: 80-100%
Medium Operation (5,000-20,000 units/month):

Equipment Investment:
  • Mid-range system: $10,000-15,000
  • Installation: 10-15% of system cost
  • Training: 5-10% of system cost
ROI Metrics:
  • Monthly savings: $1,500-2,500
  • Payback period: 6-8 months
  • First year ROI: 150-200%
Large Operation (20,000+ units/month):

Equipment Investment:
  • Industrial system: $20,000-30,000
  • Installation: 10-15% of system cost
  • Training: 5-10% of system cost
ROI Metrics:
  • Monthly savings: $4,000-6,000
  • Payback period: 4-6 months
  • First year ROI: 200-250%

Comments